Our talented structural repair team was hired as a specialty subcontractor and devised this solution. How to swap out a roof truss with a 43 foot glulam beam (GLB) inside of a school cafeteria with no access to interior space?

Robert Porter Construction completed structural repairs to the five level parking garage at St. Joseph’s Hospital in Phoenix, Arizona.

Robert Porter Construction partnered with Strategic Solar Energy to install solar canopies at Tucson/ KOA Lazydays Campground and RV Park. The project consists of 3,500 solar panels installed on top of two large RV shade canopies covering 2 acres of land. A megawatt of renewable energy is generated and integrated into Tucson Electric Power’s grid. This is a first-of-its-kind project for KOA Kampgrounds of America.

Kerry’s Car Care located at 67th Avenue and Happy Valley Road in Glendale

Robert Porter Construction was contracted to perform for the long awaited renovations to the Marinette Center of Sun City

Repairs to concrete bases performed at three separate roof top building locations