Project Info:
| Architect: | Archicon Architecture & Interiors |
| Civil Engineer: | DRW Engineering, Inc |
| Size: | 25,100 SF |
Scope:
- CMU Block Construction
- part of a 6.5 acres site
- Sitework included
- Truckwell and loading dock
El Mirage
| Architect: | Archicon Architecture & Interiors |
| Civil Engineer: | DRW Engineering, Inc |
| Size: | 25,100 SF |
Scope:
El Mirage
Associations we work with: