Robert Porter Construction ARCHIVES

Westin Kierland Resort and Spa Pool Resurfacing

Westin-Kierland-main

REP was contracted to resurface the pools, hot tubs and lazy river at the Westin Keirland Resort in Scottsdale.

Structural Challenge-How to install a 43ft glulam beam with no access to interior space

kenilworth-glb

Our talented structural repair team was hired as a specialty subcontractor and devised this solution. How to swap out a roof truss with a 43 foot glulam beam (GLB) inside of a school cafeteria with no access to interior space?

St Joseph’s Hospital Parking Garage

St-Joes_night-photo

Robert Porter Construction completed structural repairs to the five level parking garage at St. Joseph’s Hospital in Phoenix, Arizona.

Cooling tower base repair at Biltmore Financial Center

biltmore-fin-center

Repairs to concrete bases performed at three separate roof top building locations

Historic warehouse restoration

rr-new-exterior

Structural repair and tenant improvements to 25,000 SF historic warehouse in downtown Phoenix